Senin, 20 Maret 2017

Tracing the Toll Road

Itu is Monday. We had breakfast at a padangese food counter nearby. At about 09:00 Niki, a contractor engineer picked us (Anwar, Prio, and me). We went to the contractor base camp on Jalan. About 30 minutes we were there. The base camp is representative. It consists of a main building, offices for the contractor (PT Wika), the designing consultant (PT Madya M) , the supervision consultant (PT), and the investor (PT JBS).

We entered the station 58+000 and ended at the station 65+000. Then, we exit it to have lunch and prayer.

We then came to the site for the Palaran Interchange. It is close to a coal mine. The other part is still covered by forest although the road base has been constructed.

Because of showering we exited from the site again. We came to a site office. A discussion was managed concerning the problem in site.

At about 16:30 we left the office for going back to the guesthouse. We stopped by at a food stall to have dinner. At the contractor base camp we stopped again to drop Niko. The driver drove us to the guesthouse.