At 11:00 we arrived at Wika Project Office. There was time to visit the closest sites. We went first to STA 21+600. Isvan and Hanif accompanied us. We found that the track was almost connected. They put 4 cells of temporarily culvert. We also visited STA 23+150, the location that a box was aborted. We found the decision was ok.
At 12:30 we joined Friday prayer in the masjid inside the office complex. Then Isvan asked us to have lunch at a warung padang nearby.
We continued to visit rest area at STA 26+200. They told the still waiting for the structural drawing. In the office of the section we made a note. Then, we left to see right side drain under overpass at STA 31+000. It was not constructed yet.
We continued tracking to STA 47+000 where an underpass was under construction. We met Ridwan and Zulfikar. We discussed the location and dimension of the cross drain. We decided to keep the current plan. We wrote the note in the Section 2.2 office.
We then went back passing the toll track. We dropped Isvan at Wika Project Office. On the way to the hotel we stopped by at Depot Miki to take the mantous and at Upik Resto to dine.