My flight was Batik Air ID6256 scheduled to depart at 10:30. I came in Imperial Kitchen for breakfast. I checked in at 09:15 getting seat 11B for me and 21C for Priyonggo. After joining with Priyonggo we entered the waiting room at Gate E4. At about 10:00 there was a call for boarding. Our Batik Airbus A320 took off on time for Samarinda.
At about 13:45 we landed at APT Pranoto Airport of Samarinda. It is a new airport. It was my first time landed there. Saswinto picked us up and brought us to BWSK3 office on Jalan MT Haryono.
We met Ibu Rustiani the chief of recommendation affair. We were involved a brief discussion with her and her subordinate, Deny. Then, she passed the recommendation for the usage water resources space in Pondok Gong River for Balikpapan Samarinda Toll Road. We took the documents to be proceeded to get the permission from the Ministry of Public Works and Housing. We left the office for Wika Project Office at kilometerage 38.
At 19:00 we arrived at the office. We met the project manager (Heru Subagyo) to get his signatures on the documents. A short social talking took place along with another manager, Usodo. Finally, we left the office for the hotel. We checked in at Zurich Hotel Room 411. At about 21:00 we had coffee at Kaman Coffee Shop.
Tidak ada komentar:
Posting Komentar