Selasa, 29 September 2015

Tracing a New Route

It was Tuesday. At 09:30 I went to the lab. There was a fired truck at the Tembalang Toll Gate so the traffic was congested. That made me arriving late at the lab.

I made a discussion with Suharyanto about the management and the flood analysis. I did the same with Pranoto. At 15:00 I left the lab for home. I took the route of passing through the Bukit Candi Golf Housing. The track was terrible.

Tidak ada komentar: