Minggu, 28 Mei 2017

Seeing the Toll Road Project

It is Sunday. We got up at 03:00, little bit late compare to what we expected. However, we maintained time so at Imshak time (04:13) we had finished our breakfast.

In the afternoon I went to Ngaliyan area to see the progress of Semarang - Batang Toll Road project. I found that 2 overpasses had been constructed and operated. I passed through them. The road was still under construction. It seemed that the side ditch had to bear the runoff from an enough wide catchment area. I then withdrew money from the Karanganyu BNI Bank ATM. Then, I went to the Germany Clock Shop on Jalan Pemuda. I fixed my wristwatch. It costed Rp25.000. In Johar area I found that the Dugderan vendors still occupied the side walk area and the lanes of the street.

At 17:30 we broke the fasting. Nuri still provided cocktail

Tidak ada komentar: